Do you know how much your automated longitudinal welding is actually costing you?
Costs aren’t just hidden in the initial machine investment; they also lie in:
- wasted time;
- rejected parts (scrap);
- unnecessary consumption of gas and consumables.
These “invisible” costs can result in thousands of euros in annual losses without you even realizing it.
📉 How much does your current process cost you?
In our free PDF, we reveal concrete examples of annual longitudinal welding costs, such as:
- preparation, clamping, and welding time;
- scrap caused by unstable geometry and process fluctuations;
- additional costs for gas and consumable parts.
👉 In certain cases, total annual costs exceed €10,000 — even without a major change in production volume.
✅ 12 Proven Solutions for Immediate Improvement
We have prepared a free technical whitepaper featuring:
The 12 most common and effective solutions to help you:
- significantly shorten cycle times;
- reduce scrap and rework;
- lower gas and consumable consumption;
- improve welding repeatability and stability.
All solutions are designed for rapid implementation on existing automated systems without requiring major capital investments.


